Carcasses of Basins for Waste Water and Workshops at Plant

Alpha Channel: No, Looped Video: No, Frame Rate: 25, Resolution: 1920x1080, Video Encoding: H.264, File Size: 143.22mb, Number of Clips: 1, Total Clip(s) Length: 0:10, Source Audio: No

Carcasses of large basins for waste water processing and workshops at plant construction site on winter day aerial view

Most Popular Searches On Construction