Control room in hydroelectric power plant station

Alpha Channel: No, Looped Video: No, Frame Rate: 29.97, Resolution: 3840x2160, Video Encoding: H.264, File Size: 139.21mb, Number of Clips: 1, Total Clip(s) Length: 0:10, Source Audio: No, Color: Full Color, Setting: Indoors, Pace: Real Time, Composition: Mid Shot

NOVOSIBIRSK RUSSIA, – September 13 2019: Control room in Novosibirsk hydroelectric power plant station on the Ob River

Most Popular Searches On Industrial