Empty Concrete Basins to Purify Water at Construction Site

Alpha Channel: No, Looped Video: No, Frame Rate: 25, Resolution: 1920x1080, Video Encoding: H.264, File Size: 114.68mb, Number of Clips: 1, Total Clip(s) Length: 0:07, Source Audio: No

Empty concrete basins to purify drainage water at future treatment plant construction site in winter aerial view

Most Popular Searches On Construction