Hs2 Works Lond Itchington Wood, Tunnel, Aerial, Ufton, Offchurch Spring 2021 4K
- Home
- Stock Footage
- Overhead
- Hs2 Works Lond Itchington Wood, Tunnel, Aerial, Ufton, Offchurch Spring 2021 4K
Hs2 Works Lond Itchington Wood, Tunnel, Aerial, Ufton, Offchurch Spring 2021 4K
Hs2 Works Lond Itchington Wood, Tunnel, Aerial, Ufton, Offchurch Spring 2021 4K
average based on ratings.
| Alpha Channel | No |
| File Size | 165.51mb |
| Preview Resolution | 960x540 |
| Frame Rate | 29.97 |
| Total Clip(s) Length | 0:13 |
| Looped Video | No |
| Number of Clips | 1 |
| Resolution | 3840x2160 |
| Source Audio | No |
| Video Encoding | H.264 |
| Tags | 4k, aerial, color, drone view, groundwork, high speed rail, HS2, long itchington wood, natural lighting, offchurch, overhead, real time, spring, tunnel, ufton, warwickshire, worksite |