Huge Ditch Pit at the Construction Site of the Underground Metro Station Line Timelapse

Alpha Channel: No, Looped Video: No, Frame Rate: 25, Resolution: 1920x1080, Video Encoding: ProRes, File Size: 70.57mb, Number of Clips: 1, Total Clip(s) Length: 0:05, Source Audio: No

Drilling rig and crane on a huge ditch pit at the construction site of the underground metro station line timelapse. Reinforcing structures from thick iron pipes of beams and structures.

Most Popular Searches On Construction