Aerial view of the new Mersey Gateway bridge, connecting Runcorn to Liverpool. The huge project has taken many years to come to fruition, but is due to be completed in 2018.
- Home
- Stock Footage
- Industrial
- Rising Aerial View of a Cable Stayed Bridge in the Late Construction Phase
Rising Aerial View of a Cable Stayed Bridge in the Late Construction Phase
Rising Aerial View of a Cable Stayed Bridge in the Late Construction Phase
average based on ratings.
| Alpha Channel | No |
| File Size | 253.38mb |
| Preview Resolution | 960x540 |
| Frame Rate | 29.97 |
| Total Clip(s) Length | 0:29 |
| Looped Video | No |
| Number of Clips | 1 |
| Resolution | 3840x2160 |
| stock-footage-movement | Aerial |
| Source Audio | No |
| Video Encoding | H.264 |
| Tags | aerial, aerial view, architecture, bridge, bridge construction, bridge development, building, building bridges, building site, cable bridge, cable stayed, cable stayed bridge, column, concrete, concrete bridge, construction, crane, engineering, foundation, high crane, industry, infrastructure, large development, liverpool, liverpool bridge, megabuild, megabuilders, mersey gateway, Mersey River, modern, new bridge, river, river bridge, road, runcorn, runcorn bridge, scaffold, scaffolding, site, six lane bridge, steel, structure, support, suspension bridge, the mersey river, toll bridge, transportation, under construction, unfinished, water |