The final stage of road works. Laying the top layer of hot gray tarmac mix

Alpha Channel: No, Looped Video: No, Frame Rate: 25, Resolution: 3840x2160, Video Encoding: H.264, File Size: 243.52mb, Number of Clips: 1, Total Clip(s) Length: 0:16, Source Audio: No, Color: Full Color, Setting: Outdoors, Pace: Real Time, Composition: Wide Shot, Movement: Drone, No. of People: 5+

A paver coupled to a truck moves slowly down the track. The roller levels the hot paved asphalt. Road signs indicate the repair area. Workers in bright overalls laying new asphalt on the forest road.

Most Popular Searches On Construction