Top Down Overview of Tseung Kwan O - Lam Tin Tunnel Construction in 200M, 2022

Frame Rate: 29.97, Resolution: 3840x2160, Video Encoding: H.264, File Size: 282.37MB, Number of Clips: 1, Total Clip(s) Length: 00:27

Top Down Overview of Tseung Kwan O – Lam Tin Tunnel Construction in 200M, 2022

Most Popular Searches On Buildings