Worker suggestion, Safety regulations, Change orders. Design blueprints are center of attention for engineer and construction laborer at factory.
- Home
- Stock Footage
- Construction
- Worker Suggestion Safety Regulations Change Orders
Worker Suggestion Safety Regulations Change Orders
| File Size | 2.39GB |
| Preview Resolution | 960x540 |
| Frame Rate | 29.97 |
| Total Clip(s) Length | 00:20 |
| Looped Video | No |
| Number of Clips | 1 |
| Resolution | 3840x2160 |
| Age | Young Adult |
| Ethnicity | Caucasian |
| Gender | Male |
| No. of People | 2 |
| Recognizable Buildings | No |
| Recognizable People | Yes |
| Source Audio | No |
| Video Encoding | ProRes |
| Tags | analysis, assessment, blueprint, calculations, Change orders, collaboration, confirmation, construction, consultation, coordination, design, design evaluation, discussion, draft, drawings, engineer, Engineer coordination, Engineer instruction, Engineer reviewing, Equipment blueprints, evaluation, examination, factory, Factory blueprint, feedback, format, inspection, instruction, machinery drawings, manufacturing, measurements, mechanical, oversight, plan, Plan examination, prototype, refinement, reviewing, safety regulations, site surveys, sketch, structure, studying, teamwork, technical, techniques, verification, visualization, Worker suggestion |